Spotlight: HDGL Storage Buildings and Hot Strip Mill
Lowering construction costs with minimized steel and fabricator-friendly details.
As a member of the CH2M Hill design team, Ruby performed structural design of three buildings totaling nearly 1.5 million square feet, and the slab...
Learn more